2013 October Update – Starboard Head

Chris Avatar

Parts of the floor have been glued down, so that the bench can be built for the basin. Plumbing through to the black water tank is incomplete, and needs to be finished before the floor can be glued down.

[alpine-phototile-for-picasa-and-google-plus src=”user_album” uid=”106672678129024570025″ ualb=”5934563220811222385″ imgl=”none” style=”gallery” row=”4″ grwidth=”800″ grheight=”600″ size=”320″ num=”8″ align=”center” max=”100″ nocredit=”1″]

Leave a Reply

Your email address will not be published. Required fields are marked *