Now that the gas installation is complete, the galley construction can be finished. We have just completed a shelf behind the sink. The coving and fairing is complete, and it is all ready to finish the painting. Painting out the galley is on the critical path, and we need to get this completed as soon as possible so that the turret can be built over the saloon.