2014 Autumn Update – Visitor’s Cabin

Chris Avatar

This is the second sleeping cabin on our boat. While it is slightly smaller than the main cabin (so as to provide storage for the water tanks), the bed is queen sized, and the cabin has an attached head that can operate as a shower.

The cabin is almost complete. The top coat paint is on, and the deck glued down. The temporary supports for the deck can be removed once the deck hatch above the bed is fitted. The cables are in place for all lights, sockets, and pumps. There needs to be the doors for the cupboards built, as I have only made a pair of prototype doors at this stage.

Little has changed in here for the last 2 months, as we concentrate on the aft sections of the boat in order to get it water tight as soon as possible.

[alpine-phototile-for-picasa-and-google-plus src=”user_album” uid=”106672678129024570025″ ualb=”5990087058935824033″ imgl=”none” style=”gallery” row=”4″ grwidth=”800″ size=”320″ align=”center”]

Leave a Reply

Your email address will not be published. Required fields are marked *