2014 Autumn Update – Port Hull Aft Locker

Chris Avatar

The void at the aft end of the port hull has finally been closed in.

For a long time, we were considering building in a live bait tank. In the end, we took the easy way out and simply closed it in. The interior had a coating of epoxy painted on, and the sump in the bottom sealed up with cloth.

Leave a Reply

Your email address will not be published. Required fields are marked *