2014 Autumn Update – Port Hull Aft Locker

Chris Avatar

The void at the aft end of the port hull has finally been closed in.

For a long time, we were considering building in a live bait tank. In the end, we took the easy way out and simply closed it in. The interior had a coating of epoxy painted on, and the sump in the bottom sealed up with cloth.

[alpine-phototile-for-picasa-and-google-plus src=”user_album” uid=”106672678129024570025″ ualb=”5990124663421105185″ imgl=”none” style=”gallery” row=”4″ grwidth=”800″ size=”320″ align=”center” nocredit=”1″]

Leave a Reply

Your email address will not be published. Required fields are marked *