Building SeeBeeZee
-
-
-
-
Cabin Floors
Our cabin floors are 12mm ply sheeting supported on framing. The framing generally runs longitudinally,…
-
-
-
Navigation Station Fitout Commenced
The fitout of the cabins is a structural component of the completed hull. Shelves are…
-
-
Preparations for Floor
The inside of the hulls had to be glassed over before the floor structure is…
-
More Bathroom Photos
These are some older photos of the bathroom, showing the internal wall and high seat…
-
Fitting the Toilet
Work is progressing forward in the starboard hull, after starting with the steps, the rudder…
-
The case for CNC cut frames
There was a lot of effort required to program the frame geometry into the software…
-
-