Chris
-
-
-
Rubbing Strakes
A design modification that I discussed with the designer are these rubbing strakes. Rather than…
-
-
-
-
-
Full-time Boat Building
Progress on the boat will accelerate now that I am no longer working. Being a…
-
2014 Autumn Update – Port Hull Aft Locker
The void at the aft end of the port hull has finally been closed in.…
-
2014 Autumn Update – Visitor’s Cabin
This is the second sleeping cabin on our boat. While it is slightly smaller than…
-
2014 Autumn Update – Main Cabin
The main cabin is virtual complete. The cabin has been painted out with the top…
-
2014 Autumn Update – Galley
Now that the gas installation is complete, the galley construction can be finished. We have…
-
2013 October Update – Port Head
The head in the bow of the port hull is an en-suite for the visitor’s…
-
2013 October Update – Port Cabin
The cabin in the port hull is being set up for visitors. The bed runs…
-
2013 October Update – Starboard Wardrobe
The wardrobe, forward of the starboard cabin, is complete, painted out with the deck glued…
