Life on board
SeeBeeZee

  • ,

    Darfat Peak

    We’re in the western end of the chain of islands that run out from the eastern corner of Misool in Raja Ampat, Indonesia. The attraction to here is the walking track to a lookout on the top of the…

    Chris Avatar

Recent Stories

  • Published on

    Sheeting the Bow

    We have changed the sheeting, again, on the bow of the port hull. The objective of the change is to reduce,…

    Chris Avatar
  • Published on

    Moving the First Hull

    Here are some photos from last week, when we moved the first hull aside so that the second could be commenced.…

    Chris Avatar
  • Published on

    Port Hull Frame Assembled

    Last weekend we moved the starboard hull off the building jig, and got started on the port hull. Progress had been…

    Chris Avatar
  • Published on

    Rudders

    With the first hull nearly ready to be turned over, the rudder must be fitted. The design specifies the rudder post…

    Chris Avatar
  • Published on

    Second Hull Commenced

    We have now cut the frames for the second hull of our Peter Snell designed Easy Cat “Sarah”, a 40 foot…

    Chris Avatar
  • Published on

    Hull Clad

    With the plywood cladding of the hull complete, we have commenced the fibreglass coating on the hull.

    Chris Avatar
  • Published on

    Outboard Pod

    The outboard pods form part of the bridgedeck that joins the two hulls. The pod is now finished on the first…

    Chris Avatar
  • Published on

    Keel

    The keel is now complete, resting on the top of the upside-down first hull. In retrospect, this post recaps the construction…

    Chris Avatar
  • Published on

    Modes of Transport

    In a quiet moment, I caught Birgit contemplating various modes of transport

    Chris Avatar
  • Published on

    Bow Voids

    Right up in the bow are two voids. These are between the stem and the first frame (Frame 1) and then…

    Chris Avatar
  • Published on

    Finger Plane

    I have had a short setback to the building, having planed the end off my left index finger. It was all…

    Chris Avatar
  • Published on

    Sheeting Commenced

    Sheeting starts at the bow. I was concerned about the bow sheeting on other Easy cats I have seen in construction.…

    Chris Avatar

Search

Latest Post

Subscribe Our Newsletter

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore.

[contact-form-7 id=”de17a25″ title=”Newsletter Form”]